20 February 2007

Day 5: Kitchen remodel

Today: Rough electrical starts, meaning wires are running and hanging all over the place.



Here, an old switch (at the top of the picture) is taken out. Its space will be plugged. The space for the new switch (at the bottom of the picture) is added on the wall going into the mudroom.

Plus, the estimate on plumbing repairs upstairs isn't as bad as we feared. All in all, better Tuesday than Monday.

No comments: